1. Repair & Maintanance of  River Bank protective work in between km 2.975 to km 3.00m at D.C ghat along the left bank of the Littlle Jamuna River  in C/W Naogaon Town Protection Project under Naogaon O&M Division, BWDB, Naogaon, during the FY 2016-2017.

 

2. Re-excavation of Jabai Beel Khal from km. 0.450 to km 18.000 = 17550.00 m including Jabaibeel in c/w Jabaibeel FCDI Project in Upazila:- Shapahar & Porsha under Naogaon District under Naogaon O & M Division, BWDB, Naogaon during the FY 2017-2018 & 2018-2019.

 

3. Re-sectioning of Embankment from km 2.080 to km 2.112 equal to 32.00 m, in c/w Construction of  Embankment at right bank of Atrai River Sub-project in Upazilla: Dhamoirhat, District: Naogaon under  Naogaon O & M Division BWDB Naogaon during the FY 2016-17.

 

4. Emergency Temporary protective work along the Right Bank of Atrai River from Km 2.100 to Km. 2.115=15m in C/W Construction of Embankment at Right Bank of Atrai River Sub-project at Rospur in Upazilla-Dhamuirhat,Dist-Naogaon under Naogaon O & M Division, BWDB Naogaon during the FY 2016-17.

 

5. Emergency Temporary protective work along the Left Bank of Atrai River at purba Nondonpur from Km 3.600 to Km. 3.730=130 m in C/W Silimpur-Saligram Sub project in Upazilla-Dhamuirhat,Dist-Naogaon under Naogaon O & M Division, BWDB Naogaon during the FY 2016-17.

 

6. Clearing jungles, Ditch filling work etc. At Pirojpur BWDB Office and Colony under Naogaon O&M Division, BWDB, Naogaon during the FY 2016-2017.

 

7. Re-excavation of Jabai Beel Khal from km. 0.450 to km 18.000 = 17550.00 m including Jabaibeel in c/w Jabaibeel FCDI Project in Upazila:- Shapahar & Porsha under Naogaon District under Naogaon O & M Division, BWDB, Naogaon during the FY 2017-2018 & 2018-2019.

 

8. River Bank protection work at Mahashasan from km 8.100 to km 8.320 equal to 220.00 m & at Polipara from km 9.150 to km 9.530 equal to 380.00 m Total Length 600.00 m along the Left Bank of the Atrai river in Upazila patnitola District-Naogaon under Naogaon O&M Division BWDB Naogaon during the FY 2016-2017.

 

9. Repair & Maintenance of Manda BWDB office Bath Room, Clearing jungles etc. under Naogaon O&M Division BWDB Naogaon during the FY 2016-2017.

 

10. River Bank protection work at Mamudpur from km 0.00 to km 0.700 equal to 700 m along the Right Bank of the Atrai in Upazila: patnitola District: Naogaon under Naogaon O&M Division BWDB Naogaon during the FY 2016-2017.

 

11. Bank Revetment work from km 11.200 to km 11.2235 equal to 23.50 m along the left Bank of the punarbhana River at Karmudanga in C/W construction of Embankment at left bank of the punarbhaba river project in upazila: shapahar, Distric: Naogaon under Naogaon O&M Division BWDB Naogaon during the FY 2016-2017.

 

12. Repair & Breech Closing of Embankment in between km 101.00 to km 126.00 equal to 66.00 m in C/W polder-D Sub-project in Upazilla: Manda District: Naogaon under Naogaon O&M Division BWDB Naogaon during the FY 2016-2017.

 

13. Emergency Temporary protective work at 10 nos inlet along the Right Bank of Atrai River in between Km 0.000 to Km. 10.00 in C/W Polder-C Sub project in the place of Chalkbalu, Koilabari, Shohorabari & Vangipara in Upazilla- Manda, Dist- Naogaon under Naogaon O & M Division, BWDB Naogaon during the FY 2016-17. 

 

14. Emergency Temporary protective work along the Right Bank of Fokirni River in between Km 17.100 to Km. 17.120 = 20 m besides the 1 no inlet  in C/W Polder-d Sub-project at Sonadanga in Upazilla- Manda, Dist- Naogaon under Naogaon O & M Division, BWDB Naogaon during the FY 2016-17. 

 

15. Emergency Temporary protective work along the Lift Bank of Atrai River From Km 3.300 to Km. 3.325 = 25 m in C/W Patnitola Sub-project at Purbo Patichora in Upazilla- Patnitola, Dist- Naogaon under Naogaon O & M Division, BWDB Naogaon during the FY 2016-17. 

 

16. Emergency Temporary protective work along the Right Bank of Atrai River in between Km 30.500 to Km. 31.000 = 65 m in C/W Polder-C Sub-project at Pachupur in Upazilla- Atrai, Dist- Naogaon under Naogaon O & M Division, BWDB Naogaon during the FY 2016-17. 

 

17. Emergency Temporary protective work along the Right Bank of Atrai River in between Km 32.000 to Km. 32.500 = 55 m in C/W Polder-C Sub-project at Malipukur in Upazilla- Atrai, Dist- Naogaon under Naogaon O & M Division, BWDB Naogaon during the FY 2016-17. 

 

18. Emergency Temporary protective work along the Right Bank of Atrai River from Km 36.200 to Km. 36.220 = 20 m in C/W Polder-C Sub-project at Shikarpur in Upazilla- Atrai, Dist- Naogaon under Naogaon O & M Division, BWDB Naogaon during the FY 2016-17. 

 

19. Emergency Temporary protective work along the Right Bank of Atrai River in between Km 36.130 to Km. 36180 = 50 m in C/W Polder-C Sub-project at Shikarpur in Upazilla- Atrai, Dist- Naogaon under Naogaon O & M Division, BWDB Naogaon during the FY 2016-17.

 

20. Emergency Temporary protective work along the Right Bank of Atrai River in between Km 36.230 to Km. 36.280 = 50 m in C/W Polder-C Sub-project at Shikarpur in Upazilla- Atrai, Dist- Naogaon under Naogaon O & M Division, BWDB Naogaon during the FY 2016-17.

 

21. Supply and Installation of Brand  Computer with Laser Printer & accessories ( One Laptop & Two Laser Printer accessories ) in C/W ADP project  `Jabaibeel Flood Control, Drainage & Irrigation Project in Upazilla: Sapahar and Porsha under Naogaon District` under Naogaon O&M Division BWDB Naogaon during the FY 2016-2017.

 

22. Supply of 1 No. Motor Cycle, 125 CC in C/W Jabaibeel Flood Control, Drainage & Irrigation Project in Upazilla: Sapahar and Porsha under Naogaon District under Naogaon O&M Division BWDB Naogaon during the FY 2016-2017.

 

23. Supply and Installation of Laptop & Computer ( 1 No. Laptop, 1 No. Computer, 1 No. Printer 2 Nos. UPS ) in C/W ADP project  `Protection of Bank From erosion of Atrai river in 3 (Three) nos, area in upazila patnitala and re-excavation of palashbari khal in upazila manda under Naogaon District` project under Naogaon O&M Division BWDB Naogaon during the FY 2016-2017.

 

24. Supply and Installation of 1 No. Photocopier Machine in C/W ADP project Jabaibeel Flood Control, Drainage & Irrigation Project in Upazilla Sapahar and Porsha under Naogaon District` under Naogaon O&M Division BWDB Naogaon during the FY 2016-2017.

 

25. Construction of 10 Nos Inlet at varies place on Jabaibeel flood Control, Drainage & Irrigation project in upazila: sapahar and Porsa under Naogaon O&M Division, BWDB, Naogaon FY 2017-2018.

 

26. Re-excavation of Polashbari Khal from Trimohoni to Jalalabad (Km. 0.015 to Km. 2.201 equal to 2.186 Km) in connection with “ Protection of bank from erosion of Atrai River in 3 (three) nos. area in Upazila-Patnitala and Re-excavation of Polashbari Khal in Upazila-Manda under Naogaon District” in Upazila: Manda, District: Naogaon under Naogaon O&M Division, BWDB, Naogaon during the Year 2016-2017.

 

27. Construction of 14-vent (1.80m x 2.25m) Drainage Regulator on Telekhari Khal at Hapania in c/w Jabaibeel FCD Sub-Project in Upazila:- Sapahar in District:- Naogaon under Naogaon O&M Division, BWDB, Naogaon During the FY 2017-2018 & 2018-19.

 

28. Re-sectioning of Embankment along the Left Bank of the Fakirni River from km 139.010 to km 139.650=640.00 m. at Shibpur in connection with Polder-C Sub Project in Upazila-Manda, District-Naogaon under Naogaon O&M Division, BWDB, Naogaon during the FY 2017-2018.

 

29. Breach Closing work at Dangapara from km 10.100 to 10.150=50.00 m in Patnitola Upazila District- Naogaon and at kolinipara & Bhogobanpur from km 8.018 to 8.050=32.00 m, from km 9.120 to 9.133 m, from km 9.460 to 9.483=23.00 m I,e total=118.00 m in Dhamourhat Upazila District- Naogaon in C/W Construction fo Embankment of the Right Bank of Atrai River Sub Project in Upazila-Patnitola District: Naogaon under Naogaon O&M Division, BWDB, Naogaon during the Year 2017-2018.

 

30. Re-sectioning of Embankment in between km 100.00 to km 126.00=80.00 m. along the left Bank of Shib River in c/w Polder-D Sub Project under Naogaon O&M Division, BWDB, Naogaon during the Year 2017-2018.

 

31. Repair of Bank Protection Work Near Pajorvanga Bazar (from M 47.00 to M 69.00 = 22.00 m) along the left bank of the Atrai River in c/w Naogaon Polder-1 Sub Project in Upazila-Manda, District- Naogaon under Naogaon O&M Division, BWDB, Naogaon during the year 2017-2018.

 

32. Precautionary Potective Work on the Right Bank of the Punarbhaba River From km 0.050 to km 0.100 = 50.00 m at Kormodanga in c/w Construction of Embankment at Left Bank of the Punarbhaba River Project in Upazila:- Shapahar in District:- Naogaon under Naogaon O&M Division, BWDB, Naogaon During the FY 2017-2018.

 

33. River Bank protection work at Mamudpur from km 0.00 to km 0.700 equal to 700 m along the Right Bank of the Atrai in Upazila: patnitola District: Naogaon under Naogaon O&M Division BWDB Naogaon during the FY 2016-2017.

 

34. Slope Protection Work at approach Embankment (both side) of Hapania regulator in between from km. 13.800 to km 14.230 = (400+400) = 800.00m in C/W Jabaibeel FCDI Project in Upazila:- Sapahar & Porsha, under Naogaon District:- under Naogaon O & M Division, BWDB, Naogaon During the FY 2018-19.

 

 

এ প্রকল্প গুলো বাস্তবায়নের ফলে নওগাঁ জেলার জনপদ, শিল্প ও সরকারি/ বেসরকারি ব্যবসা প্রতিষ্ঠান রক্ষা করা হয়েছে। উক্ত প্রকল্প গুলো বাস্তবায়নের ফলে আর্থ-সামাজিক উন্নয়ন, কর্মসংস্থানের সুযোগ সৃষ্টি, নদী বাহিত পলি ডি-সিল্টেশনের মাধ্যমে পরিবেশগত ভারসাম্য রক্ষা পেয়েছে। প্রকল্প গুলো বাস্তবায়নের ফলে ব্যবসা-বাণিজ্যসহ সব রকমের সরকারি/ বেসরকারি কার্যক্রমসহ দারিদ্র বিমোচনে সহায়তা করা সম্ভব হয়েছে। 